Our solutions:
Case Study:
Temporary Clubhouse
Mid Kent Golf Club, providing premium clubhouse facilities during renovation
Mid Kent Golf Club, Kent
6m x 18m premium solid wall structure
8 months (6 month hire, extended by 2 months)
Project Overview
We delivered a comfortable and functional temporary clubhouse for Mid Kent Golf Club, ensuring uninterrupted service for members while the existing facilities underwent extensive renovation.
The club needed a solution that matched the high standards their members expected — this wasn’t a case of simply putting up a tent and hoping for the best. It had to feel like a real clubhouse. Installed in September 2025, the structure was in use throughout the winter months and performed exactly as required — fully climate controlled, fully fitted, and fully operational from day one.
Originally contracted for 6 months, the client extended the hire by a further 2 months — a result we’re always pleased to see, as it reflects how well the structure served its purpose.
- Installed in just 3 days with minimal disruption to club operations
- Levelled sub-frame floor system installed over significantly uneven ground
- Full climate-controlled heating system for winter comfort
- Bespoke custom-branded bar counter fitted to client specification
- Extended by client for an additional 2 months beyond the original hire period
- Dismantled and site cleared in a single day on completion




Key Features
To meet the club’s high standards, we installed a premium 6m x 18m solid wall structure — a significant build that required careful engineering given the challenging site conditions. The ground at the project location was highly uneven, so our team deployed a specialised sub-frame flooring system to completely level the area before construction began. The result was an exceptionally safe, sturdy and seamless platform that you would never have known was sitting on sloped ground.
Inside, the structure was fitted out to a genuinely high standard — this was a clubhouse, not a welfare unit, and the finish reflected that. Every detail was considered, from the commercial carpet to the bespoke bar counter.
- 6m x 18m solid and glass wall construction
- Specialised sub-frame levelling system over uneven ground
- Full climate-controlled heating system — installed and operational throughout winter
- Integrated professional lighting throughout
- High-quality commercial carpeting
- Bespoke custom-branded bar counter, built to client specification
- Installed in 3 days — dismantled in 1 day