Case Study:

Temporary Workshop Classroom

Rugby College. A solid wall temporary workshop classroom that kept teaching going during building works

Project Address

Rugby College, Rugby, Warwickshire

Specifications

Solid wall structure with a 3m eave height, full HVAC system, levelled vinyl floor and commercial lighting

Timeline

10 month hire

Project Overview

Rugby College needed a temporary workshop classroom while major renovation work was carried out on its existing buildings. Putting teaching on hold wasn’t an option, so the college needed a space that could be ready quickly and work as a normal classroom while also handling practical workshop sessions.

That meant plenty of headroom for tools and machinery, proper heating and cooling all year round, and a solid, level floor that could take heavy foot traffic and equipment without wearing out.

We designed, delivered and installed a solid wall structure built around those needs. It was ready within a tight delivery window, so classes moved across without upsetting the academic year, and it stayed in place for the full 10 month hire while the building work carried on.

Need to keep teaching during building works? See our temporary classrooms and our solid wall structures for hire and purchase.

temporary workshop classroom rugby college 3
Glazed double door entrance to the temporary workshop classroom
temporary workshop classroom rugby college 2
Solid wall temporary workshop classroom at Rugby College
temporary workshop classroom rugby college 5

Key Features

We raised the eave height to 3m so there was plenty of overhead space above the workshop areas. Students could work with machinery and tools safely, and the room still felt open and bright when it was used for theory lessons.

A full HVAC system handles heating, air conditioning and ventilation, so the temporary workshop classroom stayed comfortable through every season of the hire. The floor is a solid, properly levelled base finished with heavy duty vinyl. It’s easy to keep clean and stands up to constant foot traffic and the wear that comes with workshop use.

Commercial lighting runs throughout, giving good visibility in both the classroom and practical areas. Put together, it gave the college a secure, weatherproof building that met its health, safety and training standards while the main campus works went ahead.

We also build temporary workshops and insulated structures for training, teaching and practical spaces.

Get a free quote quickly.

Tell us what you require
We aim to reply within the hour!