Our solutions:
Case Study:
Solid Wall Classrooms
Temporary classroom structures for primary schools
Project Address
Surrey
Specifications
2 solid wall classroom units
Timeline
6 Months
Project Overview
WeBuild supplied and installed two solid wall temporary classroom structures at a primary school in Surrey. The classrooms were required to house pupils safely and comfortably for six months while essential building works were carried out within the main school building.
The school needed a fast, reliable solution that could be installed with minimal disruption to the school day and removed cleanly once the main works were complete. Both units were fully fitted and ready for use ahead of the agreed start date.
- Installed with minimal disruption to daily school operations
- Solid wall construction for a warm, quiet learning environment
- Fully compliant with temporary educational building requirements
- Removed and site cleared on completion of the main building works




Key Features
Both classroom units were constructed using solid wall panels, providing significantly better insulation, acoustic performance and durability than traditional PVC structures — essential for a working school environment used throughout the school day. The units were designed to integrate neatly into the school site, with access ramps fitted as standard to meet accessibility requirements.
- Solid wall panel construction for superior insulation and acoustics
- Access ramps fitted to both units as standard
- Double-glazed doors and windows for natural light and ventilation
- Internally fitted and ready for immediate classroom use
- Six-month hire with full removal and site clearance on completion
- Delivered and installed by our own in-house team
